- Checklists
- Energy
- Transformer maintenance
Power transformer maintenance checklist
Preventive and corrective maintenance protocol for power transformers — recorded in the field, with or without signal.
Power transformer maintenance is what separates an asset that lasts 30 years from a catastrophic failure. A transformer is expensive, has long replacement lead times and, when it fails, can catch fire or leave a whole area without supply. Most of those failures give warning long in advance: dissolved gases in the oil, a bushing starting to run hot, silica gel saturated by ingress moisture.
The problem is not technical, it is one of record-keeping. Trends — temperature, oil analysis, tap changer operations — are only useful if they are captured over time. When each maintenance job is noted on a loose sheet, there is no history to anticipate the failure, and no evidence to back up the asset’s condition in an audit or an insurance claim.
This checklist covers the full cycle: safe de-energisation, oil, insulation, cooling, tap changer and protective devices, with close-out and traceability.
How to use it with CaptaLog
Copy this template to your account and adapt it to the make and rating of your transformers. The technician completes it from their phone next to the equipment — even if the substation has no signal — and everything syncs on reconnecting. Every test value is stored with a date and an owner, and findings turn into assigned actions with a supporting photo.
The checklist, exactly as you download it
A real section of the free PDF — the template itself is in Spanish. Every item is answered Conforme, No conforme or N/A, on paper or from your phone, with or without signal.
Use this template with your team
Copy it to your account, tailor it to your needs and fill it in the field — with or without signal.